A typical project follows four clear phases. Because every Hllye court ships as a modular system, your local team — not a specialist flown in from abroad — can handle the assembly with our 3D manuals.

01

Foundation & Civil Works

A reinforced concrete ring beam (typically 40cm x 40cm) around the perimeter anchors the steel pillars securely. The playing area uses porous concrete or asphalt, ready for turf.

02

Steel Structure Assembly

Unload the container and erect the hot-dip galvanized S235JR steel frame. Our modular plug-and-play system bolts together quickly with standard tools.

03

Glass Panels & Mesh

Install the 10mm or 12mm CE-certified tempered glass panels and the electro-welded galvanized mesh, following the numbered assembly drawings.

04

Turf, Sand & Lighting

Lay the fibrillated or monofilament turf, apply the silica sand infill, and mount the LED lighting (300-400 lux standard). Ready to play.

Foundation Requirements for Padel Court Construction

The foundation is the hidden cost that surprises many first-time investors. You cannot place a padel court on grass or uneven ground. Here is exactly what your civil works contractor needs to prepare:

  • Reinforced concrete ring beam — typically 40cm wide x 40cm deep around the perimeter to anchor the steel structure.
  • Porous concrete or asphalt slab — the inner playing surface, laid to a smooth level for professional turf.
  • Drainage — a slight fall or drainage system to prevent water pooling on the playing area.
  • Space around courts — leave at least 1.5m to 2m between courts or walls for player movement and maintenance access.

Leasing land and can't dig? Our Portable Padel Court uses a self-supporting steel base with zero concrete foundation — perfect for temporary or leased sites.

Padel Court Foundation and Steel Structure

Padel Court Construction Costs & Timeline

Understand the full picture before you budget. These are typical ranges — contact us for a precise quote for your destination.

Cost ComponentTypical RangeNotes
Classic Court (factory direct)$12,000 – $16,000Maximum durability, best value for high-traffic clubs
Panoramic Court (factory direct)$15,000 – $22,000Seamless 12mm glass corners, premium viewing experience
Ocean Freight (40HQ container)$2,500 – $6,000Holds exactly 3 complete courts; order in multiples of 3
Civil Works & Foundation$10,000 – $25,000Depends on land condition; done by your local contractor
Assembly & Installation$2,000 – $3,000With Hllye 3D manuals, a competent local contractor can install it
Total per Court (installed)$25,000 – $45,000Fully installed and ready to play
15–20 days

Production time for 1–3 courts from deposit

20–40 days

Ocean transit: Middle East ~20 days, Europe/Americas 30–40 days

1–2 weeks

On-site assembly by your local contractor with our 3D manuals

Installation Support from Our Engineers

You don't need to fly in a specialist team. Every Hllye order includes the tools your local team needs to build with confidence:

  • Step-by-step 3D assembly manuals in PDF format
  • Foundation drawings and civil works requirements
  • Video guides covering all four installation phases
  • Remote engineering support via WhatsApp or video call
Talk to Our Engineers
Construction FAQ

Padel Court Construction & Installation FAQ

Planning a project? Get precise construction cost and lead time for your destination.

Request a Construction Quote